Check the drawings
Look for the required concrete strength, mix notes and any placement or testing requirements on the approved project information.
Understand what the MPa number means — and why the project or engineer specification should determine the concrete strength you order.
MPa stands for megapascal. In a concrete specification, the MPa value is used to express compressive strength. Rock-Tuff’s standard concrete schedule contains a range of specified-strength options, but the number alone does not tell you whether a mix is suitable for your structure or site.
The correct concrete requirement can depend on structural design, loading, exposure, placement method, aggregate size and other project-specific factors. For that reason, the safest starting point is always the engineer, drawing, bill of quantities or other approved project specification.

Look for the required concrete strength, mix notes and any placement or testing requirements on the approved project information.
A slab, footing, column, pool or industrial floor may have different design requirements even when the volume is similar.
If the concrete will be pumped, the placement method should be included when the mix requirement is confirmed.
If the requirement remains uncertain, confirm it with the responsible project professional rather than selecting a strength from a general example.

Concrete enquiries can also involve aggregate size, pump-mix requirements, special mix designs, quantity, delivery timing and testing requirements. Rock-Tuff’s quote builder captures these details so the enquiry can be assessed as a complete project requirement rather than only an MPa number.
MPa means megapascal. In concrete specifications it is used to express compressive strength, generally associated with a specified test age and testing method.
No. A higher number does not automatically make a mix appropriate for every project. The required concrete must match the structural design, exposure conditions, placement method and project specification.
Use the strength stated by the engineer, designer or project specification. Rock-Tuff can discuss the supplied mix requirement, but a website guide should not replace structural design information.
Do not guess for structural work. Confirm the requirement with the responsible project professional, or select the assistance option in the quote flow while the specification is being confirmed.